Parramatta, NSW
80m² rooftop home, Parramatta — from feasibility to install
Modelled scenario — not a completed project.
- Building
- 1970s four-storey walk-up, 16 lots, flat concrete roof
- Homes added
- 1 × AH-80 (80m², two bedroom, private terrace)
- Timeline
- Feasibility to occupancy modelled at 11–14 months
- Modelled outcome
- Airspace proceeds modelled to cover a full roof membrane replacement and a lift modernisation, with the balance returned to the capital works fund.
How the project runs
- 1
Feasibility
Structural desktop review, crane radius check from the adjacent street, planning pathway confirmed against the City of Parramatta LEP.
- 2
Owners corporation
Scenario assumes a special resolution passed at a general meeting after two information sessions and independent legal advice.
- 3
Design & approval
Setback design to sit below the sightline from the street; development application lodged with structural and acoustic reports.
- 4
Manufacture
Module built offsite while approvals progress — roughly 12 weeks on the production line.
- 5
Install
Single-day crane lift under a road-occupancy permit, followed by services connection and fit-off.